Collection and assembly project and main and auxiliary materials list Item address: Owner's name: Contact number: Duration:
No. Project Unit Quantity Construction Process No. Basic Material Unit Quantity Brand Specification and Model No. Main Material Unit Quantity Brand Specification Model Unit Price Total Loss 5% Loss 5% Loss 5% Yuan No.1 Ground Engineering Strong Electric Material Ground Material
1 Living room floor shop Antique brick item 1:3 cement mortar combined layer, surface 600*600 antique tiles (main material customer) 1 electric coil pigeon brand 4mm2 red 1 living room floor tile m2
2 kitchen floor anti-slip floor tile item 1:3 cement mortar combined layer, surface paste 300*300 anti-slip brick (main material customer) 2 electric coil pigeon brand 4mm2 blue 2 kitchen floor tile m2
3 Kitchen floor waterproofing item Lloyd waterproofing agent and Hesha cement waterproof layer (1800mm high, bedroom wall full of walls) 3 electric coil pigeon brand 2.5mm2 red 3 bathroom floor tiles m2
4 Waterproof treatment for toilet wall and wall surface, Loual waterproof agent and river sand cement waterproof layer (1800mm high, bedroom wall full of walls) 5 Electric coil pigeon brand 2.5mm2 blue 4 living balcony floor tile m2
5 Floor tiles for anti-slip floor tiles for the toilet 1:3 cement mortar combined layer with 300*300 non-slip floor tile (main material customer) 5 electric coil pigeon brand 1.5mm2 red 5 living balcony floor tile m2
6 Sunshine Window Stone Countertops Main Material Customer Supply & Manufacturers Installation 6 Electric Coil Pigeon Card 1.5mm2 Blue 6 Home Garden Tile m2
7 bedroom floor leveling item 1:3 cement mortar leveling 7 electric coil pigeon brand 1.5mm2 green 7 floor mosaic m2
8 Backfill leveling for toilets Demolition of wall-breaking bricks, 1:3 cement mortar levelling 8 Electric coil Pigeon brand 1.5mm2 Bicolor 8 step marbles m2
9 balcony floor paving items 1:3 cement mortar combined layer, surface paste 300*300 anti-slip brick (main material customer) two weak materials 9 marble threshold stone two-day shed project: 1 network cable Miamp Sinomart dual screen 10 marble ground
1 Living room, restaurant ceiling ceiling flat top project practice see construction drawings, 15mm Wu Mu licensing wood board. Veneer panel. Wood keel and auxiliary materials 2 closed line Mi Zhengseng RG-6 copper 11 bedroom floor
2 How to use the roof molding method for details See the construction drawing, 15mm Wu Mu licensing wood board, 9 PCT board, wood keel and auxiliary materials (single row) 3 phone ring AMP 4*0.5 pure copper 12 garden balcony wood preservative
3 guest. Restaurant ceiling latex paint base wall putty leveling. US Lai primer. two super easy to wash latex paint (spray the main material plus 2 yuan / m2) 4 audio coil is 2*0.513 ground stone
4 bedroom and study ceiling latex paint base wall putty leveling. US Lai primer. two times ultra-washable latex paint (spray the main material plus 2 yuan / m2) three PVC pipe 14 ground culture stone
5 kitchen ceiling aluminum buckle plate cover item 0.6 thick Ruidisi aluminum buckle board. keel. auxiliary material and Yinjiao line installation (main material customer self-supply factory installation) 116PVC pipe root billion general light C pipe two-day canopy material
6 toilet ceiling aluminum buckle plate cover item 0.6 thick Ruidisi aluminum buckle plate. keel. auxiliary material and Yinjiao line installation (main material customer self-supply factory installation) 2 lock buckle lock cover set million 161 kitchen aluminum buckle plate
7 Gypsum Yinjiao 70*70 gypsum Yinjiao line and installation (main material customer self-supply factory installation) 316 elbow has a billion 162 wooden grille three wall surface engineering 416 three pass a million 163 wooden false beam
1 guest. Restaurant and corridor wall latex paint base wall putty leveling. US Lai primer. two times ultra-washable latex paint (spray the main material plus 3 yuan / m2) 516 directly a billion 164 kitchen moisture board
2 bedroom and study wall latex paint primer base wall putty leveling. US Lai primer. two ultra-easy to wash latex paint (spray the main material plus 2 yuan / m2) 616 line card package 165 ceiling shade Yinxian
3 Lacquer wall latex paint basement wall putty leveling. US time Lai primer. Two times ultra-washable latex paint (spray the main material plus 2 yuan / m2) 720PVC tube root universal million light C tube hanging mirror 6
4 kitchen wall tile item 1:2 cement mortar combined layer, surface paste 200*300 wall tile (main material customer self-sufficient) 820 elbow a million billion 20 three wall surface material
5 bathroom wall wall item 1:2 cement mortar combined layer, surface paste 200*300 wall tile (main material customer self-provided) 9 lock lock cap cover million billion 201 wall wallpaper
6 Balcony wall skirting brick item 1:2 cement mortar combined layer, 150*150.60*240 wall tile (main material customer self-conceited) 1020 directly a billion 202 wall marble four wood works 1120 three pass one billion 203 wall Culture stone
1 TV wall shape item 15mm finger board. Wood keel. Gypsum plaster board. Auxiliary material (photo construction) 1220 line card package billion 204 wall glass five doors project 13 yellow wax root 125 wall aluminum composite panel
1 small door suit suit door factory direct measurement of production and installation (main material customer self-supply, factory installation) 14 yellow wax pipe root 166 wall fire board
2 Living room door set suite factory direct measurement of production and installation (main material customer self-supply, factory installation) 15 yellow wax root 207 solid wood heading
2 bedroom suite door item set door factory direct measurement production and installation (main material customer self-supply, factory installation) 16 bellows ring 168 glass brick
3 aluminum alloy glass door project aluminum alloy glass door factory direct measurement of production and installation (main material customer self-supply, factory installation) 17 wire box a mountain city A86 series 9 refractory brick
5 kitchen door installation item set door factory direct measurement of production and installation (main material customer self-supply, factory installation) 18 electrical tape a Lion card A type 10 wall fast paint the United States
6 Hardware Installation Items Li Wen Locks. Hinge. Door stopper and door leaf installation (main material customer self-provided, factory installed) 19 electrician blue tape a positive four-door window material
7 Sunlight Window Enclosure Suite Door Factory Direct Measurement Production and Installation (Main Material Customer Self-Supply, Factory Installation) IV PVC Drainage 1 Bedroom Suite Door Six Furniture Fabrication 150 PVC Tube Midea Universal Lightweight C Tube 2 Kitchen Wooden Glass Sliding Door
1 How to create and install wardrobe items Refer to the construction drawing; E1 moisture-proof plate or pine wood production (Customer-made furniture factory custom-made and installed) 250 bends
2 Shoe cabinet production and installation practices are detailed in the construction drawings; E1 moisture-proof plate or pine wood production (custom-made furniture factory customized and installed) 350 three-pass one million 505 bathroom aluminum alloy door
3 bookcase production and installation of the project see the construction plans; E1 level moisture-proof plate or pine production (customer-owned) furniture factory custom and installation) 450 Shen Shui Wan a billion 506 aluminum alloy door line
4 Workmanship for production and installation of desks (standard height) See the construction drawings for details; E1 moisture-proof plate or pine wood production (custom-made and custom-made furniture factory for customers) 545 degree elbow 7 billion aluminum alloy glass sliding door
5 main and auxiliary bathroom cabinet set practices see construction drawings; oak bathroom cabinet (Customer furniture factory for custom and installation) 6110PVC water pipe Mide billion universal light C tube 10 density board false shutter door seven electrical engineering 7 elbow Billion 11011 wood blinds and windows
1 Electric Material (Wire) Strong Power: Pigeon Brand Wire. Weak: Zhengtong Zhengxun (phone line network line closed line audio line) 8 three pass a million 11013 solid wood cabinet door color
2 Electrical Installation Labor Spoiler Switch and Pipeline Transformation and Installation 10 PVC Adhesive Bottles 16 Plastic Steel Doors and Windows
1 PVC pipe project has five million PP-R water 17 aluminum alloy doors and windows
2 switch panel. Socket and box a Langon 118 series switch socket (main material customer self) 1PP-R cold water tube Taurus 2018 frameless glass sunshine window
3 downlights, a can of Langon downlights (main material customer self-contained) 2 hot water pipe root Taurus 2019 stealth screen window
4 spotlights a Langneng spotlight (main material customers for self) 3 inner wire elbow Taurus 20 five hardware materials
5 low-voltage lamps, a low-power lamp can be Longneng (main material customer self-) 4 elbow Taurus 201 aircraft hinge
6 diffuse light with m solid diffuse light strips and connectors (main material customer self-contained) 5, etc. directly a Taurus 202 slide
7 Fluorescent Tube Holder T4-5 Light Stand and Tube (Main Material Customer Self-Provided) 645 Degree Elbow Taurus 203 Gas Support
8 lamps and lanterns installation item tube. shooting. low pressure. Yuba. ceiling. Hanging and diffuse reflector lamp and Other lamps installed (main material customer self) 7 and other three links a Taurus 204 combined eight water supply and drainage works 8 plugs 205 door suction
1 PPR fittings Jinniu brand PP-R pipe (Kitchen primary and secondary health hot and cold water fittings) 9 faucet 206 locks
2 Water Supply and Drainage Installation Labor Expenses Kitchen and Toilet Each is a 10 High Pressure Pipe Root 207 Hanging Slide Rails
3 water accessories set of stainless steel water accessories and hoses (main material customer for self) 11 copper inlay 208 pulley
4 High-pressure pipe roots 9 animal husbandry Wang high pressure pipe (main material customer self-supply) 12 raw material with a 9 handle
5 angle valve a nine animal husbandry king angle valve (main material customer self-supply) six natural gas pipe 10 glass clip
6 Washing machine faucet Jiu Mu Wang stainless steel faucet (main material customer self-contained) 1 trachea meter Foshan Rifeng 121611 seasoning blue
7 stainless steel floor drain nine Jiumu Wang stainless steel floor drain (main material customers for self) 2 inner wire elbow Foshan Rifeng 121612 meters box
8 Sanitary Ware installation labor fee sets the main. The second bathroom is a set of 3 inner wire three pass a Foshan Rifeng 121613 pot rack
9 Bathroom Lens Zhang moisture mirror 600 * 900 or 800 * 1000 (mm) (main material customer self-contained) 4 inner wire direct Foshan Rifeng 121614 dish rack
10 Bathroom Accessories Set Jiumu Wang Jiujiantao (main material customer self-sufficiency) Seven woodworking materials 15 Mirrors 9 Others 1 Woodworks Zhang Tianjin 15mm 17 feet
1 wire groove and water pipe slot m2 hydroelectric pipe slot 2 decorative panel Zhang Jinyang six furniture part
2 Wiring trough m2 Hydroelectric pipeline trough Cement mortar leveling 3 Wood keel bale 30*401 Cabinet
3 shale brick wall (increased by the actual settlement) shale brick or light brick. river sand. cement and artificial wall 4 nine PCT board Jin Yangguang 2 bathroom cabinet
4 Wall and floor leveling (adjustment according to the actual settlement) Xianghe sand. Cement and artificial leveling (greater than 2 cm thick. Budget cost by = (auxiliary material + manual) * 2) 5 Wu Liban Zhang Jin Yangguang 3 Wardrobe
5 Material transportation fee item Party B provides materials and equipment Transportation fee from manufacturer or material market 6 Paper gypsum board Zhang Huayu 9.5mm4 bookcase
6Materials for manual transshipment items Party B provides materials to and from the bottom of the building and moves to the construction site 7Paper gypsum board Zhangtaishan 5 Desk
7 Finished Products Protection Fees Construction Site Protection and Protective Measures for Finished Products 8 Light Steel Keel Squared Non-Upper Man 6 Shoe Cabinet
8 Material storage and maintenance costs Construction site A. B. Custody of storage materials for both parties 9 Round nails Jin Fu Qiang 7 TV cabinet
9 slag removal project waste manpower from the construction site to the designated location within the residential property management (excluding vehicle transport) 10 guns nail box Honglin 8 wine cooler
10 Temporary Facilities Fees Construction Desks, High Stools, Wooden Ladder, etc. 11 Horse Nail Boxes
11 Equipment Expenses Depreciation of construction tools. Maintenance and consumables expenses 12 White latex buckets Workers and peasants 10 Dustbins 13 Polyurethane buckets Carlsberg Seven electrical materials 14 Expansion screws 1 Switch panel 15 Drywall screw box Spring rain 2 Air switch Eight painter's materials 3 Information box 1 Talc powder package Zhengda 4 strong electric box 2 Gypsum powder package Liangping 5 Ventilation fan 4 Putty plastic bucket macro paint 1 Downlight 5 White plastic bucket Worker and peasant 2 spotlight 6 roller Dulux 3 double headlights 7 sand paper Silly 4 Surface Mount Downlight 8 Wool Brush Holder 5T4-5 Tube 9 Pig Hair Brush 6 Lights with 10 Latex Paint Primer Bucket Dulux Mess Rifle 7 Slide Spotlight 11 Latex Paint Topcoat Bucket Dulux Ultra Easy Wash 8 Ceiling lamp 12 Cellulose 9 Yuba lamp 13 Kraft paper with a 10 mirror headlight 14 paper tape 13 living room chandelier 15 towel Zhang 14 restaurant chandelier 16 funnel 15 bedroom chandeliers 17 Dacron cloth 16 balcony garden lamp 18 cooked powder package nine sanitary ware materials 19 small plastic basin 1 basin 9 masonry material 2 pedestal basin 1 cement package Wai Xiaqiang 32.5#3 squatting toilet 2 river sand sluice Yangtze River sand 4 toilet 3 stone powder 5 bathtub 4 big plastic basin 6 shower room 5 towels 7 Shower partition 6 water repellent bucket 8 basin faucet 7 white cement kg 9 bath faucet 8 red brick 10 shower faucet 9 light brick 11 washing machine tap 10 Ash bucket 12 Wash basin 11 Shovel 13 Wash basin faucet 12 Broom 14 Bath accessories 13 Mop 15 Urinal 14 Steel ball 16 Delay flush valve 15 Toothpick bag 17 Water tank 16 Pig hair brush handle 18 angle valve Ten basic parts m2 80*268=21440 19 High pressure pipe eleven tax 5% If the landlord needs to issue a formal project invoice, it should pay the tax of 5% of the total construction cost in accordance with the tax regulations. 20 The total cost of construction of water-sewer fittings 12 Cost: 80*268 =21440 21 Floor drain project Remarks: Base material Remarks: Main item Remarks:
1. The project is based on experience and its purpose is to implement the specific content of the project construction to the customer. It can be adjusted according to the customer's different needs. However, neither the ceiling nor the ceiling is to be adjusted in unit price. 1. The basic materials are strictly in accordance with the national regulations on environmental protection. Standards and engineering quality standards shall be supplied to the construction site. 1. Party A's supply materials shall also meet the national standards. Materials that do not meet relevant standards shall not be adjusted and replaced after being put forward by the constructor. The responsibility shall be borne by the owners.
2. If Party A adds, changes or changes the project during construction, the design change order signed by Party A and Party B shall prevail. If Party A does not obtain the consent of Party B, Party A shall arbitrarily delete the project or procurement budgetary materials and shall compensate 20% of the project. The loss is to Party B. 2. The basic material can be increased by 5% as a compensation adjustment due to market fluctuations. 2. A supply material is transported by Party A to the construction site. After Party B's signature is signed, Party B will take custody of it. At the construction site, The damage or loss caused by Party B is the responsibility of Party B.
3. The color of the latex paint in this project shall not exceed two. For each type of latex paint, the color of the latex paint shall be increased to RMB 100. The main material of the machine shall be increased by RMB 3/m2. If the wall causes latex Paint cracking, Party B is responsible for patching; 3. The basic materials are delivered by the material wholesaler to the residential real estate, the owner acceptance qualified signing before entering the construction site for construction. Any base material that has not been approved by the owner is not free to be included in the construction. Qualified materials must be replaced. 3. Any sophisticated or easily damaged main material shall be provided by Party A's invited manufacturer for installation support or independent installation. The construction party shall cooperate with the factory to do on-site coordination work. The corresponding costs shall be borne by Party A.
4. Items not included in this quotation are not covered by the project. If there is a serious difference between the budgeted project volume and the actual project volume, the actual amount of consumption should be +10% of the amount of loss. Home garden. Roof garden. Buildings and building glass houses. Expansion of buildings, etc., should be added according to the actual amount of the project, the supply of main and auxiliary materials shall be settled through consultation between the parties. The construction procedures may be entered after the owner signs the approval and pays additional costs. 4. In principle, the basic materials Do not arbitrarily change the brand specifications, the owners do have special needs, after the parties negotiate and adjust the brand spreads and make up, before they can be replaced. If the owner of the material for self-provided problems, the construction party proposed not adopted, the responsibility borne by the owners. The party delaying the supply of materials will cause the project to be delayed. The construction party shall not be liable. If the supply of the main material is delayed indefinitely, Party A shall make a written explanation to the construction party and agree on the start date. At the same time, the storage of the main and auxiliary materials at the construction site shall be transferred to Party A's responsibility. , Loss of any material damage during the shutdown period has nothing to do with the construction party.
5. Increase the number of projects. Walls will be demolished at 20 yuan/M2. Brick wall will be 100 yuan/M2. Walls and grounds will be leveled at 20 yuan/M2 (within 2 cm in thickness). Doors will be treated at 100 yuan each, and the network will have 2 bathrooms. , telephone/closed circuit, living room and study bedroom 1 each, over part of the cable. Closed circuit by 100 yuan / root, telephone line by 50 yuan / root settlement. Balcony increase 100 yuan per pipe, waterproof layer 50 yuan per square, circulating water Each set of materials costs 500 yuan. Antique brick hooking 5 yuan per square meter of artificial and dressing. 5. Manpower handling materials Upstairs floor is done within 6 floors. For each additional 3 floors (including 1 floor), an increase of 1 yuan per square meter per square foot. The jump layer increases the total cost of basic decoration by 10%. Three jump increase to increase the total cost of basic decoration 20%. Villa to increase the total cost of basic decoration 25%.

Three trees Lacquer tiles Paints Cement Lacquer-lacquer Windows Glass Living room wall Colors for living room tiles Living room chandelier Kitchen doors Decor room Parlors Wine cabinets Fittings for partitions Doors Doors made of stainless steel Glass Doors for partitions Doors for wine cabinets Partitions floor Tiles Glass tables Villa furniture Kitchen glass Sliding door mirrors Lamp Wine Cabinet Partition Cabinet Red Brick Marble Cabinet Kitchen Wall Tile Partition Glass Door Glass Door Grille Glass Tile Cabinet Door Antique Flooring Art Glass Shutter Door Glass Furniture Antique Tile Kitchen & Bathroom Ceiling Stainless Steel Cabinet Glass Door Kitchen Cabinet Door Stainless Steel Bathroom Cabinet Villa Door Cabinet Doors Doors and Windows Study Room Furniture Study Design Bathroom Doors Bathroom Ceiling Materials Bathroom Wall Tiles Small Study Toilet partitions Toilet ceiling

Double pump

Gear Pump,Double Gear Pump,Cbql Double Gear Pump

Raypoo Technology Co., Ltd. , http://www.szhydraulicvalves.com

Posted on