During the renovation process, the construction team belongs to the role of real work, and their quality and construction level directly determine the quality of the entire project. However, the “guerrilla” activities are frequent nowadays, and the construction teams of some small-scale and weak-looking decoration companies are dauntless. Therefore, how to choose is to test the eyes of the decoration owner.
Xiao Bian sums up the seven construction procedures that construction workers are most likely to cut corners. You should monitor them carefully in the decoration process, and pay attention to whether their construction methods are professional or not.
Process one: Substrate treatment phenomenon: Before applying latex paint, if the wall substrate is not clean, leaving dust, greasy and other things, it will cause latex paint off, discoloration, tile paste is not solid and other issues; if the damp wall The surface has not been "back-covered" with varnish beforehand, and it will also cause water vapor to seep. Watermarks and peelings will appear on the patent leather.
Experts advise: Substrate treatment is the first step in construction, and it is also a key step that directly affects the following aspects. Before painting the wall, you should first check whether there are any large holes in the wall. Fill the walls first, and then remove the original wall covering. The wall repairing place is sanded to ensure that the texture is consistent with the large area after the repair, and the floating ash is cleaned to ensure that the coating layer is firmly bonded to the base layer.
Process II: ground leveling phenomenon: Many consumers will find that the home wood floor seams at the edge of the phenomenon of tilting, especially close to the corner between the wall more obvious, its important reason is due to some workers before laying is not careful or Intentionally crude, some even pave the yellow sand.
Experts advise: Before paving floors, we must first measure the flatness of the ground. If there is more difference in the flatness of the ground, it is recommended to use cement mortar for leveling. After the leveling, there should be no sense of emptyness on the ground and there should be no sanding on the ground. After leveling the ground with cement mortar, be sure to wait for the ground to dry. Use a dedicated level ruler to determine the flatness of the entire floor before installing the floor.
Process 3: Wall Slotting Phenomenon: In order to bury the exposed pipelines, the construction team must slot the walls and the ground. However, some workers are barbaric in their operations. It is not clear whether they are slotted at random on the load-bearing wall, which will damage the building's load-bearing structure and reduce the earthquake resistance of the house.
Experts advise: go to the property or the developer to understand the location of the bearing wall, load-bearing wall do not move. Then determine the alignment and position of all the lines so that they can be accurately positioned when grooving. Before the wall is grooved, all sewers should be blocked to prevent blockage of the stones, ash or cement blocks in the wall from entering the sewer. In addition, the depth of the trough is basically 1.5 centimeters more than the diameter of the pipeline. The outside of the pipeline is 1.5 centimeters away from the wall to ensure that the wall surface is not cracked after sealing the cement, wall tiles or wall paint.
Process 4: Brushing on the wall Phenomenon: Brushing paint is the easiest link for cutting corners. Originally, it was necessary to brush the wall paint three times in accordance with the provisions of the internal wall, but the construction team only brushed it again, and there was no difference on the surface, but in fact there was a slight color difference. Some construction teams even exchanged paint with impurities, resulting in uneven surface coating and severely affecting the decoration effect.
Experts advise that it is necessary to understand the area of ​​painting before painting to estimate how much paint is needed to avoid unnecessary waste. In addition, the deployment of a good paint, especially the same color of the paint to be used up once, if there is a partial repair during the project, the repair site should be dry after the wall to re-prime, can not directly paint the location of the brush primer brush Topcoat. At the same time, it is also necessary to check the smoothness of the coating in time. If it is not smooth and smooth with a fine sandpaper, apply a topcoat.
Process 5: tile paving phenomenon: The frequency of the use of tiles is very high. If workers cut corners, problems such as empty tiles, missing seams, etc. may easily occur. In addition, the cement and adhesive used for paving tiles are also delicate, and if the ratio is unreasonable, there will be problems such as falling off.
Experts advise: to tile the wall must first pull the hair, especially the original place with waterproof putty, we must shovel out all the putty, or sticky. Glazed tiles are generally soaked in water for more than two hours before being laid, and then dried and laid under natural conditions. Otherwise, brick cracking may occur due to the action of cement. The glass mosaic is generally not soaked in water, soaking the water will form a mosaic particles off, but it is troublesome to put up; In addition, after the tile is tiled for 12 hours, it should be checked on the brick surface. If there is any empty drum sound, it should be re-layed.
Process 6: Sewer Line Phenomenon: If water pipes and fittings are not sealed properly, it is easy to leak water. In the renovated bathroom, the basin's position often shifts to a location that is offset from the entrance to the sink, and it is often difficult to use the plumbing that comes with the basin. The installation workers are trying to save trouble and generally do not make S-bends, resulting in the direct passage of the washbasin and the sewer, and the odor will come from the sewer.
Experts advise: After the completion of the waterway construction, it is necessary to check whether the water is unobstructed. First use pots of water, and then fill the water at various places. These are the basin water, the bathtub water, the toilet water, the kitchen and the toilet, and the balcony floor drain. Each water inlet should be poured into two basins of water. Sound, and no surface water is considered normal. The construction process must supervise the installation of S bends and odor-resistant floor drains.
Process VII: circuit reconstruction phenomenon: Some construction teams of electricians do not wiring according to construction requirements, all kinds of different lines go the same line, such as the TV antenna, telephone lines and distribution lines into the same casing, so that television, telephone The reception is disturbed, or the insulation and moisture-proof treatment of the joint are not good, and the phenomenon of open circuit, short-circuit, etc. occurs; even the line that is hidden for the purpose of reducing the cost is not sleeved, and the result is light leakage, and it will threaten the safety of the house. And the owner's life.
Experts advise: In construction, consumers must supervise the electrician to strictly follow the operating procedures for construction, and avoid modification while constructing. Before the construction is carried out, a circuit modification plan must be requested to indicate the direction and specific location of the wire, and in particular, the joints of the pipeline should be marked. If there is a change in the construction process, the owner should also communicate with the designer and draw a remodeling plan before starting the construction so that if a failure occurs later, the owner can easily find the line location.

Three trees Lacquer Tiles Paints Concrete TVs Decoration Houses Lacquer paints Decorations Find Decorations Companies Flooring Tiles Glass Bricks Kitchen Wall tiles Kitchen Glass Sliding Doors Bathroom Tiles Bathroom Tiles Color Toilet Tiles Bathroom Design Toilet Waterproof Bathroom Leaking Tiles Floor Tiles Balcony Tiles Kitchen Tiles

Wood Powder

Wood Powder,Coconut Charcoal Capsules ,Coconut Shell Charcoal ,Food Grade Charcoal

Catalyst & Active Agent Co., Ltd. , http://www.nbteethwhite.com

Posted on