Fully-decorated homes, as the name suggests, are fully renovated homes. Buy full-decoration residential consumers save time and effort to save money. However, because it is fully renovated and stayed in, many problems in renovation are less likely to be discovered. Experts suggest that the inspection of fully-decorated houses should be conducted in five steps. First of all, the acceptance of eyesight ... 80 after a small husband and wife marriage, petty bourgeoisie, romantic mood, fashion show, a member of the exclusive cash discount, Mediterranean style blue + white, mosaic, even for home art, young hot mom 50,000 to create two homes 1 Shop Cash Discount Coupons · Floor heating This winter is not afraid of cold · Small apartment mix new trend · 200,000 luxury to create 95 flat space · Dulux paint cost-effective large PK · TV wall small space large content

Fully-decorated homes, as the name suggests, are fully renovated homes. Buy full-decoration residential consumers save time and effort to save money. However, because it is fully renovated and stayed in, many problems in renovation are less likely to be discovered. Experts suggest that the inspection of fully-decorated houses should be conducted in five steps. First of all, the inspection and acceptance of the hidden project:

The first step is to check the water pipes in the kitchen and toilet to see if the drainage pipe is drained smoothly and if the water pipe is leaking. At this time, you can put the sink, basin, and bathtub full of water, and then discharge it, check the speed of drainage, and check the toilet's launching. Repeat the drainage test several times to see the drainage effect.
The second step is to check the distribution line. Turn on all the light switches to see if the lights are on. If the conditions permit, you should check the socket with a multimeter to see if there is power. Check the telephone line with a telephone to see if there is any signal. Use the antenna check tool to check the signal of the TV antenna.
The third step is to check the hollowing of the kitchen and bathroom and other parts of the wall tiles. This is very simple. You can use a small rubber mallet to knock on the tile. If the emptying rate exceeds 3%, it indicates that there are quality problems. If the result is lower than the quality of the project, it can be considered as qualified (empty drum rate means one hundred pieces. How many empty drums are in tile floor tiles).
The fourth step is to inspect the woodworking products and paintwork products. This step is more complicated. Simply put, it should be checked whether the wood products are deformed, whether the cracking at the joints is serious, whether the hardware is installed upright, whether the paint is flowing, and whether the wall paint has a large range of cracking. These are basically It depends on our eyes to observe.
The fifth step is to do a close inspection of some corners, such as whether there is a water barrier at the entrance of the bathroom, whether there is rain flowing into the window, whether the switch socket panel has scratches, and whether the bathroom hardware is installed properly.

Entrance decoration children's room decoration residential TV decoration paint switch socket decoration style fashion small apartment bathroom tile bathroom floor tile bathroom door kitchen tile decoration home

Cocont Shell Activated Carbon

Cocont Shell Activated Carbon ,Activated Charcoal Filter ,Granular Activated Carbon ,Activated Charcoal Bulk

Centrifugal Pump Co., Ltd.Artificial Graphite & Active Carbon , http://www.nbactivecarbon.com

Posted on