The new house was soon finished, and I was too tired to afford it. The consumption of energy and energy is one aspect, but the one that makes me the most tired is the feeling of repeated deception and lessons learned.
1, buy a big core board to prevent replacement: When buying a big core board, I took the in-house carpenters to pick the board. When I first entered the hall, there was a group of plate hawkers gathered around and I had a good quality core board in the carpentry phase. After I booked six sheets, I first got a place to eat with the carpenters. When we came back and were ready to pay, the woodworkers I took a closer look at the six boards I had just ordered, and then quietly told me that there were a few defective products on the six good boards. When I compare carefully, it is still difficult to distinguish between true and false. I am afraid that I can see the handle and the traders have described their good faith. At the same time, they are staring at the carpenters I brought. I took out the deposit and wrote the delivery address. At the same time, I also took out a pen and signed the corner of the big core board below. I said, "Prisoner, later gentleman," so I bought real wood. .
2. Buy aluminum buckles to prevent short products: When the project is halfway, there are eight aluminum buckles on the ceiling, and there are seven missing keels as the brackets. The workers said that they were converted and checked by the merchants selling building materials. If the error is between two or three blocks, it is now missing eight blocks. In desperation, I had to find market management and wanted to be fair to them. Market management people said that this matter had been passed for more than half a month.
3, buy tiles to prevent the lack of size: according to the area of ​​the kitchen, we asked vendors to calculate the number. When it was half paved, the bricklayer told me that each tile pulled was one to two millimeters smaller than the normal size, and as such, the blocks were laid down one by one, leaving a two-centimeter slit at the corner, and had to Then the other complete tiles were cut off to make up, so the bricks were not enough, that is to say, the number of tiles pulled was correct, but the total area was not enough, which really made me laugh and cry.
4, buy lamps to prevent old goods: buy an energy-saving light bulb for the ceiling lamp, back on the top, just opened for a while, the lamp back end appeared dark gray, the electrician told me that this light bulb is used.

Tile Plates New Home Kitchen Tile Tiles Specifications

Steel Structure House refers to the building which is structured by steel beam and column, its advantages are: 1, light weight, high strength, the weight of Steel Structure is about 1/2 of concrete structure. 2. Safety and reliability, good resistance to wind and earthquake. 3. The steel structure components are made in the factory, reducing the work load in the field, shortening the construction time, and meeting the requirements of the industrialization. 4. The steel structure factory is made of reliable quality, accurate size, convenient installation, and easy to cooperate with the related parts. 5, steel can be recycled, and the environment is less polluted when it is built and dismantled.Prefabricated steel structure house

Prefabricated Steel Structure House

Prefabricated Steel Structure House,Light Steel Frame House Building,Prefab Light Steel House Villa,Prefabricated Steel Structure Residential House

Zhongda Steel Structure , http://www.zhongdametal.com

Posted on