For various reasons, many people will choose to be renovated in winter. However, the weather in winter is very cold, which can cause some inconvenience for home improvement construction, such as laying tiles. Xiao Bian found that many owners are asking about the issue of sticking bricks in November. This article will be followed by everyone and hope to answer your doubts.

Here's the question >>

Is it possible to stick floor tiles in November?

能Will floor tiles be constructed in November?

● From the calendar point of view, in November, just after the beginning of winter, the temperature difference between different regions is relatively large. At this time, the south is not cold, and the temperature is basically above ten degrees. In some northern cities, the temperature is close to the coldest temperature in the south. Therefore, we cannot answer this question absolutely. We need to make a choice based on the local conditions.

● Whether or not tiles can be laid is mainly based on temperature conditions. For home decoration, tiles can be tiled if the room temperature stays above 5°C .

● If the local temperature is lower than 5°C at this time, it is not suitable for paving tiles. Otherwise, the adhesiveness of cement mortar and bricks will be reduced, which will affect the effect of the bricks, and it may appear to fall off.

● If the temperature is too low, below 0°C , the moisture in the cement mortar will freeze, and the water will increase in volume when it freezes, and it will become smaller after the ice, which will also lead to cement mortar. In the process of dry solidification, the volume becomes larger and smaller, which will lead to deterioration of the curing strength of the cement mortar, which will seriously affect the cement mortar strength, resulting in poor bonding of the ceramic tile.

  

â–· Will you stick tiles in November?

● Tiles are required for room temperature, but there is no direct relationship between the time the tiles are wet and the time they are applied. The tidal wave of tiles was mostly caused by problems such as the damp environment and the water seepage in the buried pipes.

● In November, it will not return to the tide by sticking the floor tiles, and it will be easy to return to the tide during the rainy season. As long as the indoor humidity is not high and the temperature is not too low, there will generally be no situation where the tiles will return.

  

Winter tile paving considerations

1, material storage should pay attention

In order to ensure the effect of floor tiles, we should also keep the materials properly. This is because the winter is very dry and cold. Tiles are prone to cracks. We should not mix floor tiles with other materials, and we must use sand when laying bricks. Can not be mixed with ice, if necessary, you can add some antifreeze, but this is harmful to the human body, as much as possible to use less.

  

2, the tiles to soak

Everyone should first soak the floor tiles before construction to fully saturate them, which effectively avoids emptying and falling off of the floor tiles. In addition, whether you are laying a wall tile or a floor tile, you must transition from outdoor to indoor for 24 hours. You must allow the material to heat up and wait until it is acclimated to the room temperature before you start inlaying to avoid emptying or falling off after construction.

  

3, leave the paving

Winter is the season with the largest temperature difference between morning and evening. The temperature in the morning may be below 10 degrees, and the temperature may break through 20 degrees at noon. Because the temperature difference is so great and the tiles have the characteristic of thermal expansion and contraction, everyone should leave a seam when laying bricks. Shop too tight is not enough, you must know that the base layer, adhesive layer and tile itself is not the same as the coefficient of thermal expansion and contraction, under the effect of tension, paving too tight tiles are prone to breakage and bulging phenomenon.

  

4, to correctly grasp the filling time

Some people are eager to have sex, and when the floor tiles are laid, they will be caulked immediately. It is very inappropriate to do so, and everyone should wait until the tiles are completely dried and then caulked. This is because when the tiles are not dry, they will cause the tiles to loosen, and later may cause the tiles to fall off, leaving potential safety hazards.

Xiao Bian suggestions: Stitching need to dry after the tile, usually 24 hours later.

  

Editor's Note: The above is related to the introduction of floor tiles in winter and floor tiles in November . It must have been answered in the hearts of everyone. We cannot absolutely say whether or not we can lay tiles in November. We must decide on the construction plan according to the local weather. If you have more related questions, welcome to continue to pay attention to our website information channel.