In the past, the firebrick was laid flat as it was when it was built. The contact with the salt solution was a 65×230 ​​plane of refractory bricks. In this method, the brick seams are transversely straight and pass through the furnace liner or concrete layer, so that the salt solution can easily penetrate into the brick seams. This type of masonry method has many horizontal brick joints, which can easily make the bricks float, and gradually increase the brick seams. Caused failure. After the improvement, the flat bricks were changed to staggered bricks, such as b, firstly laid a brick, and the contact with the salt liquid was a 110×230 plane of refractory bricks, which reduced the brick seams on the inner wall of the hearth. Then set up a layer of bricks, in contact with the previous layer of brick firebrick 65 × 230 plane. The placement is like b, so that the brick seams are staggered.

(1) Face-faced masonry that is in contact with salt solution has few horizontal and horizontal staggered bricks; (2) The second-tier brick seams are horizontally straight and longitudinally staggered. Such two-layer bricks are like two labyrinths, effectively preventing the leakage of salt solution, so that the salt leakage and floating brick problems are greatly improved. When the salt extraction plate is added to the electrode lead-out part, the salt furnace is mainly found in the lead-out direction of the electrode and the salt leakage and salt leakage along the electrode bar (handle). After the use of refractory bricks mixed with phosphoric acid concrete, still found salt leakage along the electrode handle.

After several groping, add 15×280×280 salt retaining plate to the electrode handle, and the salt retaining plate should be welded to the electrode handle. The position should be in the middle position of pouring phosphate concrete layer. After such improvement, the problem of leakage of salt at the electrode handle is effectively solved. The heating part of the electrode is properly lengthened in the process of disassembling the salt furnace in the past. Many times the bending of the heating part of the electrode to the furnace has been found, causing the brick seams to loosen, collapse, and even cause salt leakage.

Root Barrier

HDPE is the main component of root-blocking board, which has excellent resistance to root puncture and can resist most plant roots. Mainly used in planting roof greening, garage roof greening on the ordinary water-blocking layer, to prevent plant roots puncture damage water-blocking layer caused roof leakage.

It has good physical and mechanical properties, high tear resistance, strong deformation adaptability, puncture resistance, oil and salt resistance, acid and alkali resistance, corrosion resistance, high and low temperature resistance, and long service time. Water blocking, drainage and water leakage prevention have good effect, complete thickness specifications, low cost and simple construction.

Product Indicators
Item Test Value
0.8mm 1.0mm 1.25mm 1.5mm 1.8mm 2.0mm 2.5mm 3.0mm
Minimum Density (g/cm) 0.94
Strength at yield, N/mm 11 15 18 23 27 30 38 45
Strength at break, N/mm 21 28 33 43 51 57 71 85
Elongation at yield, % 13
Elongation at break, % 600min
Tear Resistance N 93 125 156 187 219 249 311 373
Puncture Resistance N 263 352 440 530 618 703 881 1059
Product Application

1. Stop Bamboo roots and rhizomes from spreading
2. can be used to stop weeds roots from spreading

Company Information

Customer feedback

Why choose us

Packaging & Shipping

FAQ

Q : Are you a factory or trading company?

A : We are a professional manufacturer that specialized in geomembrane, geotextile, Composite Geomembrane etc with ISO9001 certificate more than 15 years.

Q : Where is your factory located? How can I visit there?

A : Our facoty is located is No.10 Yuanshan Road High-tech Development Zone, Laiwu District, Jinan City China. You can take the plan to Jinan Yaoqiang International Airport, then we can pick you up.

Q : Could you send the sample before order confirmation?

A : Yes, we'd love to send a free sample to you for an evaluation if you need.

Q : How about the delivery time?

A : General within 3-7 days after received the deposit.

Q : Can you produce the product according to customers' requirements?

A : Sure, we are professional manufacturer, OEM and ODM are both welcome.

Q : Are you the Gold and Assessed supplier on alibaba?

A : Yes. We are the gold and assessed supplier on alibaba and has got the factory report by SGS.

Root Barrier,Fish Pond Liner,Black Hdpe Geomembrane,Hdpe Liner Geomembrane

Shandong Jinruixiang Geotextile Material Co., Ltd , https://www.jrxgeosynthetics.com

Posted on