When decorating the bathroom, the installation of wall and floor tiles, ceiling treatment, pipe installation and equipment selection should all be considered for waterproof and moisture-proof requirements, and careful arrangements should be made.

When paving walls and stones, the waterproof layer should be made under the surface layer. The cement mortar should be used to level the ground and coated with waterproof coating. Then, a layer of 1 to 2 cement mortar is used as a bonding layer to spread the floor tiles and other decorative materials. After watering, use a wooden board to make it flat and firm, and the seams are tight. Before the stone is laid, the back coating should be done to reduce the phenomenon of “water stain”. The area around the waterproof layer should be turned upside down, about 25 to 30 cm above the ground, the washstand should be 1.0 to 1.2 m above the ground, and the shower should be 1.8 m above the ground. If the paint is decorated, it should be brushed with waterproof putty and waterproof coating. The surface layer of water should be treated to slope to the ground, no flooding, no water accumulation, no leakage after 24 hours storage test.

Suspended ceilings are recommended with micro-aluminum gussets to enhance ventilation and prevent condensation. If you want to make gypsum board ceiling, you should first brush waterproof putty, then brush waterproof coating; PVC ceiling is easy to produce condensed water, and drop, should be used with caution.

Pipe installation should try to avoid changing the original upper and lower tubes. It must be horizontal and vertical, and laid firmly, and the slope should meet the requirements. The valve and the faucet are installed in a straight, flexible and convenient manner, the anti-rust paint is applied to the bright tube, and the anti-corrosive paint is applied to the dark tube. The water supply pipe is tightly connected with accessories and appliances, and there is no leakage through the water test. The floor drain design is still based on the above sewer line, and the surface should be slightly lower than the ground.

The sanitary fixtures are installed in the correct position and the upper edge of the appliance is level. Bathroom appliances should be branded and have good waterproof performance. For example, the shower heater should be used in a humid environment for a long time. The outer casing should be made of stainless steel. It has good anti-corrosion performance, and it is equipped with waterproof power switch, cable and plug. Or when the power is off, you are not afraid of water and water splashing, and will not cause leakage or damage. Also need to be equipped with a waterproof lamp cover, waterproof socket and so on.

In the bathroom should avoid the use of wooden materials, if you need to use, you should use fireproof board or full oil decoration, can be waterproof. When making ceilings or other package decoration, the hidden wooden keel needs to be painted with waterproof coating or preservative.

It is very important that the bathroom is well ventilated. Use better quality ventilation equipment to help the water and steam evaporate quickly and keep the room fresh and clean. Do a good job in the above aspects, you will be able to experience the bathing experience of harmony between man and nature in a state of complete relaxation.

1.Application:Decoration Profile For Construction
2.Dimension: Customized dimension, OEM & ODM
3.Material: A6063, A6061, A3003 and other series alu alloy        
4.Suface treatment: Anodizing, polishing, turning ,power coating, mill finish etc
5.Equipment: CNC ,extruding machine, cold drawn machine, heating oven, straightening machine, cutting machine  

OD

OD Tolerance

ID

Tolerance

Roundness

Straightness

Circular  

 run-out

φ16-20

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ20-30

±0.02

±0.02

0.01↓

0.015↓

0.05↓

φ30-50

±0.05

±0.05

0.02↓

0.020↓

0.08↓

φ50-80

±0.15

±0.10

0.05↓

0.025↓

0.10↓


6. STANDARD PACKING:Wooden case/carton

7. Trade Terms
1. Payment: 30% T/T in advance, 70% balance pay before delivery.  L/C at sight.
2. Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.
3. Trade Term can be chosen depending on your requirements.
4. FOB Port: Shanghai
Contact Us
If you want more info.about the aluminum tubes/profiles, please feel free to contact us.
1. Attn: Karina Gu  
2. Mobile: +86-18961469527
3. Tel: +86-519-88761254

Aluminum Decoration Profile For Construction

Aluminum Decoration Profile For Construction,Aluminum Decoration Profile,Aluminum Construction Profile,Aluminum Building Profile

Changzhou YiFei Machinery Co., Ltd. , http://www.yifeialu.com

Posted on